Uploads by Evan Coffey
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
19:11, 29 August 2018 | Lyon Abbot 2.jpg (file) | ![]() |
3.59 MB | 1 | |
19:09, 29 August 2018 | IMG 6161.jpg (file) | ![]() |
3.4 MB | 1 | |
19:04, 29 August 2018 | Lyon Bayard 2.jpg (file) | ![]() |
3.53 MB | 1 | |
19:02, 29 August 2018 | Lyon Bayard 1.jpg (file) | ![]() |
4.28 MB | 1 | |
21:13, 9 January 2018 | SRM Site.jpg (file) | ![]() |
121 KB | 1 | |
21:12, 9 January 2018 | SRM Site Aerial.jpg (file) | ![]() |
158 KB | 1 | |
21:11, 9 January 2018 | SRM Missile Control Building.jpg (file) | ![]() |
140 KB | 1 | |
21:04, 9 January 2018 | SRM Warhead Building.jpg (file) | ![]() |
156 KB | 1 | |
21:03, 9 January 2018 | SRM Perimeter Acquistion Radar Building Data Processing Area.jpg (file) | ![]() |
147 KB | 1 | |
21:02, 9 January 2018 | SRM Perimeter Acquistion Radar Building Data Tape Handling Room.jpg (file) | ![]() |
125 KB | 1 | |
21:01, 9 January 2018 | SRM Perimeter Acquistion Radar Building Aerial.jpg (file) | ![]() |
188 KB | 1 | |
21:00, 9 January 2018 | SRM Missile Control Building Construction.jpg (file) | ![]() |
161 KB | 1 | |
20:59, 9 January 2018 | SRM Sprint Missile Silos.jpg (file) | ![]() |
101 KB | 1 | |
20:58, 9 January 2018 | SRM Sprint Launch Site 3.jpg (file) | ![]() |
157 KB | 1 | |
20:57, 9 January 2018 | SRM Sprint Launch Site 1.jpg (file) | ![]() |
163 KB | 1 | |
20:56, 9 January 2018 | SRM Sprint Launch SIte 2.jpg (file) | ![]() |
157 KB | 1 | |
20:55, 9 January 2018 | SM Remote Launch Site 2.jpg (file) | ![]() |
148 KB | 1 | |
19:59, 8 January 2018 | LA-94L Magazine.jpg (file) | ![]() |
122 KB | 1 | |
19:58, 8 January 2018 | LA-94L Magazine 2.jpg (file) | ![]() |
93 KB | 1 | |
19:57, 8 January 2018 | LA-94L Launch Area 2.jpg (file) | ![]() |
110 KB | 1 | |
19:57, 8 January 2018 | LA-94L Missile Assembly.jpg (file) | ![]() |
82 KB | 1 | |
19:56, 8 January 2018 | LA-94L Magazine Doors.jpg (file) | ![]() |
90 KB | 1 | |
19:55, 8 January 2018 | Launch Area.jpg (file) | ![]() |
139 KB | 1 | |
19:50, 8 January 2018 | LA-94C Radar Platform.jpg (file) | ![]() |
106 KB | 1 | |
19:49, 8 January 2018 | LA-94C Radar Pads.jpg (file) | ![]() |
146 KB | 1 | |
19:49, 8 January 2018 | LA-94C Radar Site.jpg (file) | ![]() |
150 KB | 1 | |
19:48, 8 January 2018 | LA-94C Control Area 2.jpg (file) | ![]() |
108 KB | 1 | |
19:46, 8 January 2018 | LA-94C Cantonment Area.jpg (file) | ![]() |
89 KB | 1 | |
19:23, 8 January 2018 | SL-40 Warheading Building.jpg (file) | ![]() |
129 KB | 1 | |
19:22, 8 January 2018 | SL-40 MIssile Test and Assembly Bldg.jpg (file) | ![]() |
127 KB | 1 | |
19:21, 8 January 2018 | SL-40 Launch Area Ready Room.jpg (file) | ![]() |
127 KB | 1 | |
19:13, 8 January 2018 | SL-40 Underground Magazine Doors.jpg (file) | ![]() |
107 KB | 1 | |
19:12, 8 January 2018 | SL-40 Magazine.jpg (file) | ![]() |
110 KB | 1 | |
19:11, 8 January 2018 | Sl-40 Underground Magazine.jpg (file) | ![]() |
88 KB | 1 | |
18:54, 8 January 2018 | SL-40 Launch Area Plan.jpg (file) | ![]() |
90 KB | 1 | |
18:53, 8 January 2018 | SL-40 Missile Test Assembly Area.jpg (file) | ![]() |
109 KB | 1 | |
18:51, 8 January 2018 | Enrance to SL-40 Launch Area 2.jpg (file) | ![]() |
109 KB | 1 | |
18:50, 8 January 2018 | Entrance to SL-40 Launch Area.jpg (file) | ![]() |
146 KB | 1 | |
18:30, 8 January 2018 | SL-40 Control Area Site Plan.jpg (file) | ![]() |
94 KB | from the Library of Congress | 1 |
18:28, 8 January 2018 | Nike Site SL-40 Site Plan.jpg (file) | ![]() |
105 KB | 1 | |
18:27, 8 January 2018 | Entrance to SL-40 Control Area.jpg (file) | ![]() |
122 KB | from Library of Congress | 1 |
18:23, 8 January 2018 | Cantonment Area SL-40.jpg (file) | ![]() |
113 KB | from Library of Congress | 1 |
15:30, 1 January 2018 | Fort Holmes 1865 Survey.jpg (file) | ![]() |
1.69 MB | https://www.loc.gov/resource/g3902s.cw0317370/ | 1 |
10:50, 18 December 2017 | Fort Taylor AMTB5 Mount.jpg (file) | ![]() |
2.14 MB | Gun mounts recovered during excavations at Fort Taylor | 1 |
10:17, 18 December 2017 | Fort Taylor Seminole 2017.jpg (file) | ![]() |
9.4 MB | Battery Seminole taken December 2017/ | 1 |
12:06, 24 July 2017 | Funston Battery Davis Gun 1 Rigging.gif (file) | ![]() |
80 KB | Record Group 77: Records of the Office of the Chief of Engineers, 1789 - 1999 Series: Fortification Files, ca. 1913 - ca. 1944 Item: No. 89A Fort Funston, Calif., Gun Tube No.1, Rigging for backing load to entrance of reservation., 4/14/1937 | 1 |
12:04, 24 July 2017 | Funston Battery Davis Gun 1 Ring.gif (file) | ![]() |
118 KB | Record Group 77: Records of the Office of the Chief of Engineers, 1789 - 1999 Series: Fortification Files, ca. 1913 - ca. 1944 Item: No. 246A Battery Davis Fort Funston, Calif., Placing Concrete Under step - ring at Gun Block No. 1., 4/8/1938 | 1 |
12:03, 24 July 2017 | Funston Battery Davis Placing Gun 2.gif (file) | ![]() |
79 KB | Record Group 77: Records of the Office of the Chief of Engineers, 1789 - 1999 Series: Fortification Files, ca. 1913 - ca. 1944 Item: No. 220A Battery Davis Fort Funston, Calif., Placing No. 2 Gun in Slide., 1/14/1938 | 1 |
11:59, 24 July 2017 | Funston Battery Davis Gun 2.gif (file) | ![]() |
121 KB | Record Group 77: Records of the Office of the Chief of Engineers, 1789 - 1999 Series: Fortification Files, ca. 1913 - ca. 1944 Item: No. 104A Fort Funston, Calif., Gun Block No.2, Bolts and Templet in Place., 4/15/1937 | 1 |
11:57, 24 July 2017 | Funston Battery Davis Gun 1.gif (file) | ![]() |
89 KB | Record Group 77: Records of the Office of the Chief of Engineers, 1789 - 1999 Series: Fortification Files, ca. 1913 - ca. 1944 Item: No. 110A Fort Funston, Calif. , Gun Block No. 1, Backfilling and Tamping., 4/16/1937 | 1 |