Template:PugetSoundMortarRemoval: Difference between revisions
Jump to navigation
Jump to search
John Stanton (talk | contribs) No edit summary |
John Stanton (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
* [[Battery Brannan]], [[Fort Worden]], 4 Total | * [[Battery Brannan]], [[Fort Worden]], 4 Total | ||
* [[Battery Powell]], [[Fort Worden]], 4 Total | * [[Battery Powell (1)]], [[Fort Worden]], 4 Total | ||
* [[Battery Seymour]], [[Fort Casey]], 4 Total | * [[Battery Seymour]], [[Fort Casey (1)]], 4 Total | ||
* [[Battery Bankhead]], [[Fort Flagler]], 4 Total | * [[Battery Bankhead]], [[Fort Flagler]], 4 Total |
Latest revision as of 15:14, 9 October 2020
In May 1918 two mortars were removed from each pit leaving two mortars remaining in each pit. The mortars were removed because it proved difficult to load and fire four large mortars simultaneously and there was a requirement for mortars in the World War I European theater. Even with the removal of two mortars from each pit the rate of fire did not significantly drop.
The mortars were prepared for shipment and transported on U.S. Barge #5 towed by the U.S. Steamer Wilson to Seattle with the intent of shipping them to the war zone in Europe. This shipment arrived in Seattle on 30 May 1918 with sixteen 12" mortars, two mortars from each mortar pit of the following batteries:
- Battery Brannan, Fort Worden, 4 Total
- Battery Powell (1), Fort Worden, 4 Total
- Battery Seymour, Fort Casey (1), 4 Total
- Battery Bankhead, Fort Flagler, 4 Total