Battle Control System-Fixed: Difference between revisions
John Stanton (talk | contribs) No edit summary |
John Stanton (talk | contribs) No edit summary |
||
Line 57: | Line 57: | ||
* [http://www.norad.mil/Newsroom/FactSheets/ArticleView/tabid/3991/Article/578775/cheyenne-mountain-complex.aspx NORAD - Cheyenne Mountain Complex Fact Sheet] | * [http://www.norad.mil/Newsroom/FactSheets/ArticleView/tabid/3991/Article/578775/cheyenne-mountain-complex.aspx NORAD - Cheyenne Mountain Complex Fact Sheet] | ||
* [http://www.tyndall.af.mil/library/factsheets/factsheet_print.asp?fsID=4919&page=1 USAF - System Support Facility Fact Sheet] | * [http://www.tyndall.af.mil/library/factsheets/factsheet_print.asp?fsID=4919&page=1 USAF - System Support Facility Fact Sheet] | ||
* [http://www.dote.osd.mil/pub/reports/FY2009/pdf/af/2009bcsf.pdf 2009 Status Rel R3.1 Upgrade] | * [http://www.dote.osd.mil/pub/reports/FY2009/pdf/af/2009bcsf.pdf BCS-F 2009 Status Rel R3.1 Upgrade] | ||
* [http://www.dote.osd.mil/pub/reports/FY2011/pdf/af/2011bcsf.pdf 2011 Status Rel R3.1 Upgrade] | * [http://www.dote.osd.mil/pub/reports/FY2011/pdf/af/2011bcsf.pdf BCS-F 2011 Status Rel R3.1 Upgrade] | ||
* [http://www.dote.osd.mil/pub/reports/FY2013/pdf/af/2013bcsf.pdf 2013 Status Rel R3.2 Upgrade] | * [http://www.dote.osd.mil/pub/reports/FY2013/pdf/af/2013bcsf.pdf BCS-F 2013 Status Rel R3.2 Upgrade] | ||
* [http://www.afmc.af.mil/news/story_print.asp?id=123341785 2013 Rel R3.2 Announcement] | * [http://www.afmc.af.mil/news/story_print.asp?id=123341785 BCS-F 2013 Rel R3.2 Announcement] | ||
__NOTOC__ | __NOTOC__ |
Revision as of 09:26, 29 September 2015
Battle Control System-Fixed (BCS-F) (2007-Present) - The current U.S./Canadian air defense system designed to replace the processing and display elements of the JSS System Regional Operations Control Centers (ROCC)s. As implemented in 2007 the system included two operations centers and a support center in the contiguous United states, one operations center in Canada and one each in Alaska and Hawaii. NORAD command headquarters is located at Peterson AFB, Colorado. ![]() The equipment under the designation FYQ-156 replaced the 1980s era FYQ-93 displays and processors, the GSQ-235, ROCC - Airborne Warning and Control System (AWACS) Digital Information Link (RADIL), the FYQ-155, Advanced Interface Control Unit (AICU), and the NORAD Contingency Suite (NCS). While each of the two mainland sectors is assigned about half the county as an area of operations it is possible for either sector to assume control of the whole country. Release R3-3 (2013) increased system capacity to 15,000 system tracks in support of the single sector continental U.S. operations.
{"selectable":false,"height":"400","width":"800"}
See Also:
Links:
|