Red Bluff Air Force Station
Red Bluff Air Force Station (1956-1970) - A Cold War Air Force Radar Station first established in 1956 near Red Bluff, Tehama County, California. Named Red Bluff Air Force Station after the location. Initially assigned a Permanent ID of SM-157 and later a Sage ID of Z-157. Abandoned by the Air Force in 1970. A portion continues today as Red Bluff FAA Radar Site, FAA ID of RBL.
-
Former Red Bluff AFS LRR Operations Building.
-
Former Red Bluff AFS Recreation Hall.
-
FAA Radar on Former Red Bluff AFS. FPS-6 Tower pads in the foreground.
History
Established in 1956 and became operational in 1956 as Red Bluff Air Force Station manned by the 859th AC&W Squadron. The station initially had both a Ground-Control Intercept (GCI) and an early warning mission. The early warning mission involved tracking and identifying all aircraft entering their airspace while the GCI mission involved guiding Air Force interceptors to any identified enemy aircraft. Controllers at the station vectored fighter aircraft at the correct course and speed to intercept enemy aircraft using voice commands via ground-to-air radio.
Initial equipment included one MPS-8 height-finder radar and one MPS-11 search radar.
SAGE System Transition
The transition of the manual GCI system to the automated SAGE system began with the installation of the FST-2 coordinate data transmitter and search radar upgrades. The FST-2 equipment digitized the radar returns and transmitted the digital returns to the SAGE direction center. Under the SAGE System, interceptor aircraft were directed to their targets by the direction center computers and controllers, greatly reducing the need for local controllers and equipment at every radar station.
The FST-2 was a very large digital system using vacuum tube technology. Over 6900 vacuum tubes were used in each FST-2 requiring 21 air-conditioned cabinets, 40 tons of air conditioning, 43.5 kva of prime power, and usually a large new addition to the operations building. The FST-2B modification added two more cabinets but with newer solid-state (transistor) technology to process coded responses from aircraft transponders.
SAGE System Operation

| Assigned | Direction Center | Sector | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 8 Sep 1955 - 1 Mar 1959 | Hamilton Manual Direction Center P-48 | 28th AD | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1 Mar 1960 - 1 Apr 1966 | Adair SAGE Direction Center DC-13 | Portland ADS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1 Apr 1966 - 15 Sep 1969 | Adair SAGE Direction Center DC-13 | 26th AD | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 15 Sep 1969 - 19 Nov 1969 | Luke SAGE Direction Center DC-21 | 27th AD | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 19 Nov 1969 - 30 Sep 1970 | Luke SAGE Direction Center DC-21 | 26th AD
The site began operation as a SAGE site in 1960 initially feeding the Adair SAGE Direction Center DC-13. The search radar was upgraded to one FPS-67, one FPS-6 height-finder, and one FPS-90 height-finder radar. In 1964 Red Bluff became a Joint Use FAA/ADC facility. ClosureThe Pentagon announced the closure of Red Bluff AFS and the deactivation of the 859th Radar Squadron on 5 March 1970. The official deactivation date was 30 Sep 1970. A small portion of the site was transferred to the FAA (see below). By the end of 1972, the remainder of the station was transferred to Tehama County, which developed it into Ridgeway County Park. The station's family housing annex was auctioned off to private parties. Red Bluff FAA Radar SiteIn 1971, the GATR site and the operations portion of the main station, including the search radar tower and the operations building, were transferred to the FAA continued to operate the FPS-67B search radar as part of the Joint Surveillance System (JSS) into the 1990s. A FYQ-47 Common Digitizer was probably placed in service by February 1973 when the USAF/FAA FST-2 to FYQ-47 replacement program was completed. By 1990 the site was equipped with an FPS-67B search radar and a CD-2A Common Digitizer. The Red Bluff CD-2A was scheduled to receive an upgrade kit to implement three-level weather data processing in June 1992. Mode S Beacon SystemThe Red Bluff FAA Radar Site was selected in the 1990s to become one of 21 long-range radar sites to have a Mode S radar beacon system installed. The Mode S system allowed operation in the existing beacon modes but added features to improve beacon operation by allowing aircraft identification with a single interrogation and two-way digital communication between controllers and pilots. Besides the 21 long-range sites, there were other short-range radars to be upgraded for a total of 137 sites on the implementation list. Red Bluff was #114 on the list, scheduled to receive the Mode S equipment on 28 Feb 1995. Installation required interfacing with the radar system, addition of a beacon antenna on top of the search radar antenna, a new larger radome, interfacing with the Common Digitizer (CD-2) if installed, additional communication lines and equipment. CARSR RadarThe nationwide replacement program converting FAA legacy radar systems to the CARSR radar configuration was completed by 17 Aug 2015 and Red Bluff FAA Radar Site was a part of that program. Legacy FAA radars underwent a Service Life Extension Program (SLEP) that replaced key components in the vintage ARSR-1, ARSR-2, FPS-20, FPS-66 and FPS-67 radars. The CARSR program replaced legacy klystron radar transmitters with a solid-state transmitter as well as renovating the radar receiver and signal processor. The CARSR modification also included common digitizer functionality making a separate common digitizer unnecessary. The Red Bluff FAA Radar Site is now operating with the CARSR radar. At the time of the CARSR changeout, the legacy radar in place was still the FPS-67B and the CARSR conversion included a 1561 Antenna. The secondary radar for the site is the Mode S Beacon set. The radar site data is now available to the USAF/NORAD Battle Control System-Fixed (BCS-F) operations centers (EADS & WADS) as well as the FAA Oakland ARTCC (ZOA) and adjacent ARTCCs. Other federal agencies have access to the data under the Homeland Security umbrella. Gap FillersRed Bluff AFS was responsible for the maintenance of three remote unattended gap-filler radar sites. The unattended gap filler sites were placed in locations where the main search radar lacked coverage. These sites were equipped with short range FPS-14 or FPS-18 search radars and FST-1 Coordinate Data transmitters that sent digitized radar target data to a SAGE direction center and to the main radar site. Both the radar set and the FST-1 were dual channel to increase site up time. Maintenance teams were dispatched for regularly scheduled maintenance or when fault indicators on the FSW-1 remote monitoring equipment suggested the site had problems. The FSW-1 also allowed remote operation of specific functions such as channel changes for the radar and for the FST-1, it also allowed remote operation of the diesel generators at the gap filler site. The Red Bluff AFS gap-filler radars were located at Janesville, Whitmore, and Hayfork, all in California
|




